Advanced ULO & DCA Apple Storage Facility with Centralized Cooling Station
Solution
The project implemented Ultra-Low Oxygen (ULO) and Dynamic Controlled Atmosphere (DCA) technology—developed by Fruit Control—to ensure long-term preservation of apples with maximum freshness, firmness, and marketability.
Apples are stored in plastic containers across six controlled-atmosphere chambers, each measuring 14 × 7.5 m.
Every chamber is equipped with six CO₂ removal units, allowing precise regulation of gas composition to maintain optimal storage conditions.
Project Scope & Technical Implementation
Agrovent specialists executed a comprehensive set of engineering, installation, and commissioning tasks:
Structural & hermetic solutions
-
Installation of a PIR sandwich-panel thermal insulation circuit
-
Mounting of specialized hermetic doors ensuring airtight sealing for ULO/DCA operation
Cooling & humidity systems
-
Deployment of an advanced cooling system designed for low-oxygen storage
-
Installation of a humidification system to maintain ideal moisture levels and prevent dehydration of the fruit
Atmosphere-control infrastructure
-
Delivery, installation, and commissioning of CO₂ removal systems, ULO and DCA equipment
-
Integration of specialized fruit-storage control modules tailored to apple physiology
Lighting & utilities
-
Full installation of interior lighting for chambers, corridors, attic spaces, and engine rooms
Centralized cooling station
-
A single cooling station serves all chambers
-
Equipped with multiple piston compressors
-
Built on Bitzer (Germany) compressor technology for stable, energy-efficient performance
-
Controlled by a Danfoss automation system, pre-programmed with key storage parameters specific to apple varieties, respiration profiles, and long-term CA/ULO requirements
This configuration ensures precise atmosphere control, uniform cooling, and extended shelf life—crucial for hot and variable climates in India, Africa, the Middle East, and UAE.
Distinguishing Features & Project Workflow
-
Engineering and project development
-
Procurement of equipment and materials
-
Delivery and logistics
-
Installation and system integration
-
Start-up, testing, and fine-tuning of ULO/DCA systems
The project was carried out by Agrovent design engineers, construction specialists, and controlled-atmosphere technology experts.
Looking to build or upgrade a modern ULO/DCA apple storage facility with energy-efficient cooling and precise atmosphere control?
Contact Agrovent to design, install, and commission high-performance fruit storage systems for any climate.
📞 Call: +971 50 437 7119
📧 Email: info@agrovent.com
More projects
Automated Multi-Section Vegetable Storage System for Frameless Buildings
Vegetables
Seed Potato Storage Facility with Aspiration-Based Microclimate and Bitzer Refrigeration
Vegetables
High-Efficiency Potato Storage Facility with Unified Microclimate Control System