Ventilation and refrigeration equipment for a cabbage storage (intended for 7 000 tons)
Objective
To develop a year-round storage facility with the option of making daily product shipments.
To fabricate and install the system in just eight weeks.
Solution
Dragon technology was used, and the ventilation unit was equipped with remote air coolers.
Installation of asingle-mounted spray humidification system.
CO2 removal system without valve opening.
Four storage sections were equipped with a centralized automation system.
Distinguishing features
Operational stages:
- Project development
- Purchase of equipment and materials
- Delivery
- Installation
- Start-up and adjustment operations
Design engineers and the construction department were in charge of the project, as well as Agrovent specialists in the area of ventilation equipment.
More projects
Vegetables
Ventilation equipment for a potato storage (intended for 20 000 tons)
Poultry
Turkey rearing units for 20,000 heads for the Zerno-Resurs facility
Clamp
Ventilation equipment for a potato storage (intended for 3600 tons)
Тип объекта: Type 1
All projects
Ventilation equipment for a potato storage (intended for 20 000 tons)
Poultry
Turkey rearing units for 20,000 heads for the Zerno-Resurs facility
Clamp
Ventilation equipment for a potato storage (intended for 3600 tons)
Тип объекта: Type 1